Protech Dynamic
Our Portfolio

Project Case Studies

Real projects. Real results. Discover how we've helped homeowners and businesses across Dubai with AC installations, emergency repairs, and complete renovations.

5,000+
Projects Completed
98%
Client Satisfaction
15+
Years Experience
24/7
Emergency Service
Case Study #1 AC Installation Emirates Hills

Complete Villa AC System Overhaul

Location
Emirates Hills
Project Type
AC System Replacement
Duration
5 Days
Investment
AED 85,000

warning The Challenge

15-year-old central AC system failing during summer. Original R22 system with frequent breakdowns and high DEWA bills. The client was spending AED 4,000+ monthly on electricity and still not getting adequate cooling in some rooms.

lightbulb The Solution

We designed and installed a complete new O General VRF system with 8 indoor units. The project included:

  • check_circle Complete removal of old equipment and refrigerant lines
  • check_circle Electrical supply upgrade (from 60A to 100A)
  • check_circle New refrigerant piping throughout the villa
  • check_circle 8 wall-mounted indoor units with individual zone control
  • check_circle 2 outdoor condensing units
  • check_circle Smart thermostat integration

We coordinated the work to ensure the family had cooling in at least part of the home throughout the project.

trending_up The Results

40%
Reduction in monthly DEWA bills
From AED 4,000 to AED 2,400
volume_off
Silent operation compared to old system
tune
Zone control allowing different temperatures in each room
verified
5-year manufacturer warranty on all equipment
savings
ROI achieved in 2.5 years from energy savings
format_quote

"We should have done this years ago. The new system is whisper quiet, each room can be set to a different temperature, and our electricity bill dropped by almost half. PROTECH handled everything—even the DEWA paperwork for the electrical upgrade."

AK
Emirates Hills Homeowner
Villa AC Replacement Project
Case Study #2 Emergency Plumbing Dubai Marina

Emergency Flood Response

Location
Dubai Marina (45th Floor)
Project Type
Emergency Plumbing
Response Time
38 Minutes
Total Time
4 Hours

emergency The Challenge

Major water supply pipe burst at 2 AM. Water flooding apartment and threatening to damage units below. Building security alerted but unable to help beyond shutting off main supply to the floor.

schedule The Response

2:00 AM
Client calls emergency line
2:02 AM
Dispatcher talks client through shutting off apartment main valve
2:05 AM
Emergency plumber dispatched from nearby location
2:38 AM
Plumber arrives on-site (38 min response)
2:45 AM
Problem identified—corroded pipe fitting
3:30 AM
Burst section repaired
4:00 AM
System pressure tested and verified
5:30 AM
Water restored, cleanup assistance provided
6:00 AM
Building management briefed

verified The Results

water_damage
Water damage contained to one room
apartment
Lower floors unaffected
nights_stay
Full repair completed same night
thumb_up
Building management commended our response
description
Client received detailed report for insurance
format_quote

"At 2 AM with water pouring across my floor, I was panicking. The PROTECH dispatcher talked me through shutting off the water while the team was en route. They worked until the job was done—no 'we'll come back tomorrow.' That's the kind of service you can't put a price on."

MH
Dubai Marina Resident
Emergency Flood Response

24/7 Emergency Service

We respond to emergencies day and night, 365 days a year.

call Call Emergency Line
Case Study #3 Renovation Arabian Ranches

Complete Kitchen Renovation

Location
Arabian Ranches
Project Type
Kitchen Renovation
Duration
21 Days
Investment
AED 65,000

home_repair_service The Challenge

Outdated 2005 kitchen needing complete modernization. Limited timeline due to family events. Client wanted a modern open-plan kitchen with island, new appliances, and completely new layout.

construction The Solution

Complete renovation from design to completion:

  • check_circle Demolition of old cabinetry and countertops
  • check_circle Removal of non-structural wall to create open plan
  • check_circle Electrical upgrades for new appliances (added 6 circuits)
  • check_circle Plumbing relocation for new sink position
  • check_circle New tile flooring throughout
  • check_circle Custom cabinetry (German soft-close hardware)
  • check_circle Quartz countertops with waterfall edge
  • check_circle Under-cabinet LED lighting
  • check_circle All new appliances (Bosch integrated)

Daily cleanups ensured the family could use other parts of the home comfortably.

star The Results

kitchen
Modern open-plan kitchen with 4-seat island
electrical_services
All electrical outlets properly upgraded and hidden
timer
Project completed 2 days ahead of schedule
auto_stories
Featured in Dubai Home magazine
receipt_long
Zero change orders—completed exactly as quoted
format_quote

"We got quotes from 5 companies. PROTECH wasn't the cheapest, but they were the only ones who could guarantee completion in 3 weeks. They actually finished early. The project management was seamless—one point of contact who coordinated all the different trades. The kitchen is even better than we imagined."

SR
Arabian Ranches Homeowner
Kitchen Renovation Project

Ready to Start Your Project?

From emergency repairs to complete renovations, we deliver exceptional results. Contact us for a free consultation and quote.