A systematic room-by-room check of your property before you accept it, written up as a photographed defect list you can hand to the developer. Remedial work available in-house.

Apartments, villas and townhouses Systems tested, not just glanced at Re-inspection after remedial work
Fit-out handover state showing partial flooring and finished cabinetry ready for inspection
24/7
Emergency

What a snagging inspection is, and when to do one

Snagging is the process of finding the defects in a finished property and listing them precisely enough that somebody can act on them. A snag is anything that is incomplete, damaged, badly finished, incorrectly installed or not working: a door that catches, a hollow tile, a socket wired without earth, an air-conditioning outlet blowing warm, a shower tray that holds water, a scratched panel of glass, a kitchen drawer that does not close.

Read more Read less

The best time is before you sign off on handover, while the property is empty and unfurnished, everything is visible, and nothing that later gets damaged by movers can be confused with a construction defect. The second-best time is as soon as possible afterwards.

There is a second window worth knowing about. Whatever applies to your property after handover will be set out in your sale and purchase agreement and your handover pack, and those terms differ from developer to developer and contract to contract. They are not something we interpret for you. Read your own documents, and take proper advice if the wording matters. What we do is purely technical: we tell you what is wrong with the property, in writing, with photographs, so that whatever your documents say, you are working from evidence rather than from memory.

We also inspect properties that are being taken over from a tenant, bought on the resale market, or handed back at the end of a lease, where the point is the same: an independent, documented record of condition.

If a snag needs to be fixed rather than only listed, we have the trades on our own books: waterproofing, tile repair, door repair, painting, plumbing, electrician and full property maintenance.

What we check, room by room and system by system

The inspection is methodical rather than impressionistic, and it covers finishes and systems, because the expensive problems are usually in the systems.

Read more Read less

Doors and windows. Alignment and gaps, opening and closing without catching, handles, locks and cylinders, hinges, seals and weather strips, glazing for scratches, chips and failed units, and whether external doors and windows close and seal properly. Sliding doors are checked on their tracks, and it is worth knowing that a sliding balcony door that binds now will be worse after a summer.

Walls and ceilings. Flatness and finish under a raking light, which shows what a straight-on look does not, paint coverage and consistency, patching, visible cracks, damaged corners, junctions and beading, and the fit and finish around bulkheads and access panels.

Floors. Tile lippage, hollow or drummy tiles tested by tapping, cracked or chipped tiles, grout condition and colour consistency, skirting fit and finish, thresholds, and level. Timber and vinyl floors are checked for movement, gaps and damaged boards.

Joinery and kitchens. Wardrobe and cabinet door alignment, hinge and soft-close operation, drawer runners, edge banding, shelf supports, worktop joints and seals, sink and tap installation, appliance fit and operation where appliances are supplied, extraction, and whether the units are actually fixed to the wall.

Bathrooms. Fall to the floor drain, tested with water rather than assumed, drainage speed, WC fixing and flush, cistern operation, silicone and grout quality, shower screen fit, mixer operation and temperature, water pressure, visible leaks under basins and behind WCs, extract fan operation, and the state of the access panel.

Common items. Light switches and fittings, ironmongery, blinds and curtain tracks where supplied, intercom and doorbell, smoke detector presence, and the finish of everything within reach of a hand.

The defects we find most often in Dubai handovers

Certain faults show up again and again here, because they come from how buildings get finished quickly in this market and how the climate treats them afterwards.

Read more Read less
  • Hollow and drummy tiles, from tiling laid at speed with incomplete adhesive coverage, which sound fine on day one and crack under a dropped pan two years later.
  • Silicone applied badly, or applied over dust, which fails early in wet areas.
  • Grout haze and paint spots on new marble, which are the standard finish faults on stone floors after a fast handover, and are dealt with as grout haze and paint spots on new marble rather than by grinding the whole slab.
  • Doors that bind, because they were hung and then the building and the frames settled.
  • Air-conditioning condensate drains with insufficient fall, or already partly blocked with construction debris. The ceiling stain in a new apartment is the fault we get called back to most often, and this is where it usually starts.
  • Ducts and grilles carrying construction dust, which then arrives in your rooms the first time the system runs at full load.
  • Balconies laid to a fall that runs the wrong way, or with a drain outlet set high, so water sits against the door threshold.
  • Paint over unprepared surfaces, which flashes and peels at the first wipe down.
  • Missing or unlabelled circuits at the distribution board.
  • Sockets and switches with reversed polarity or no earth continuity, which look identical to correct ones from the outside.

None of that is exotic. It is the normal outcome of finishing a large number of units on a programme, and it is exactly why an inspection pays for itself.

Air conditioning, electrics and plumbing: the parts nobody checks

A snagging inspection that only looks at paintwork is a decorating survey. The systems are where the money is.

Read more Read less

Air conditioning. Every outlet is checked for cooling, not just the unit near the thermostat. We look at airflow at each grille, thermostat operation and whether it controls what it claims to control, the condensate drain and its fall, filter condition and access, insulation on visible pipework and ducting, noise and vibration, and whether the fan coil unit is actually reachable for service, because units installed behind an inaccessible ceiling are a permanent maintenance problem you inherit. Where a unit turns out to be a unit that was undersized from the start rather than simply faulty, that is a fresh install question rather than a snag, and we will say so in those words.

Electrical. Sockets and switches tested rather than looked at, earth continuity, polarity, residual current device operation and trip test, distribution board labelling and condition, lighting circuits and fittings, and provision where you will actually need it, including a charger circuit at the board if you intend to run an electric car.

Plumbing. Water pressure at each outlet and balance between them, drainage flow and gurgling that suggests a venting problem, traps present and correctly fitted, isolation valves fitted and operable, visible leaks at connections, and water heater installation, mounting and operation.

Where relevant we check for moisture in areas that should be dry. Damp readings behind a bathroom wall or under a window at handover are worth far more than the same discovery a year later.

Where the handover is a commercial space rather than a home, the same systems checks apply, and the party who has to answer for them is usually the fit-out contractor rather than a developer's handover team.

Balconies, terraces and external areas

Outdoor areas take the worst of the climate and get the least attention at handover.

We check falls and where water actually goes, drain outlets and whether they are clear, the door threshold detail, balustrade fixing and stability, glass condition, tile condition and grout, the state of any external paint or render, external lighting and sockets and whether they are rated for outdoor use, and hose taps.

For villas that extends to the garden and boundary: gates and their operation, external doors, garden and irrigation provision, external drainage, roof access where accessible, visible roof and parapet condition, and covered parking or carport structures.

This is the area where a fault found now is cheapest. A balcony laid to the wrong fall is a substantial correction, and it is far easier to have that conversation before you have accepted the unit.

What we use

Thermal imaging for concealed damp, missing insulation and unseen water paths behind finishes. A moisture meter to confirm what the camera suggests. Spirit levels, plumb checks and pressure gauges. Every finding is photographed and located.

What you receive. A snag list: item by item, each with a photograph and a location, written so the developer's contractor can act on it without a phone call. Items are grouped by trade so the developer can issue them directly to whoever is responsible. It is a document you can attach to an email and send.

The Dubai-specific defects we find most

AC condensate drainage that discharges into the ceiling void rather than a drain, which becomes a ceiling stain in month three. Balcony falls laid the wrong way so water runs back toward the door. Silicone applied over dust in wet areas, which fails within a year in this humidity. Grouting that has not cured before handover cleaning. Missing or damaged vapour barriers on ducted AC. Doors that bind because they were hung before the building finished settling.

Read more Read less

Timing. Snag before you take handover — that is the whole point, and it is the one thing that cannot be recovered afterwards. Then again within the developer's warranty period if defects appear after you move in, since most Dubai developers carry a defects liability period after handover and the burden is on you to report inside it.

De-snagging. We re-inspect after the developer's contractor has worked, item by item against the original list, and confirm in writing what was actually fixed and what was not. A snag list nobody verifies is a list of things that did not get done.

("Snag list" is the term used in Dubai. "Punch list" is American and is not what buyers here search.)

Who approves what, and why we ask for your documents

Handover disputes go to the developer first, then to RERA, then to a court. The evidence that decides them is the snag list: dated, photographed, located, issued in writing. We build it to survive that route, not to look tidy.

The approving authority for the property itself depends on the land rather than the district. Trakhees governs Nakheel-owned land and specified zones. DDA governs its own zones. Dubai Municipality is the default. Free zones such as JAFZA run a parallel route. We confirm from your title deed or Ejari rather than assuming.

What a visual inspection can and cannot tell you

We would rather set this out plainly than have you discover it later.

Read more Read less

An inspection like this is non-destructive. We do not open walls, lift floors, cut into ceilings or dismantle equipment. That means it cannot tell you about the quality of waterproofing under a tiled floor, the condition of pipework buried in a slab, whether structural elements are as designed, or a fault that only appears under conditions we cannot create on the day, such as a leak that shows up only in heavy rain.

What it does is test everything that can be tested and see everything that can be seen, systematically, by someone who has looked at a lot of properties and knows where the shortcuts get taken. Where we suspect something behind a surface, we say so in the report as something to investigate rather than presenting a guess as a finding. If you want a specific area investigated further, that can be arranged separately, including leak investigation where there is evidence of moisture.

We also do not value the property, advise on your contract, or tell you whether to accept handover. That is your decision, and the report exists to make it an informed one.

The report you get

The report is the product, and a snagging report is only useful if somebody else can act on it without you standing next to them explaining it.

Read more Read less

Each item is listed with the room or location, a plain description of what is wrong, and at least one photograph. Location matters: "scratch on glass" is useless, "living room, left-hand sliding door panel, lower right corner, scratch approximately 100mm" is actionable. Items are grouped by room so that a contractor can work through a space in one visit rather than criss-crossing the property, and separated by trade where that is more practical.

Items are also categorised by seriousness, so that a defect affecting the function or safety of the property is not buried in a list next to a paint touch-up. That distinction is what stops the important things being lost in the volume, because a genuine snagging list on a new unit is long, and a long list without priority gets ignored.

You receive the report in a format you can forward directly to the developer, the main contractor or the handover team. It is written to be read by them, not only by you.

If you want to see the shape of that before you book, send us the community and the unit type and we will tell you what your report will contain and how long the inspection needs.

What happens after the report

You send the report to whoever is responsible for putting the items right, which is usually the developer's handover team or their main contractor. We can deal with them directly on your behalf if you would rather not, including attending site with their team to walk through the list, which removes a lot of back and forth about what an item actually means.

Read more Read less

In practice some items are accepted and fixed quickly, some are disputed, and some are described as within tolerance. Photographs and precise locations are what move an item from a matter of opinion to a matter of record. Whether and how quickly anything is dealt with is between you and the developer, and it varies enormously between developers and between projects. We do not promise you an outcome there, and anyone who does is guessing.

Where you are dealing with a landlord, a seller or an outgoing tenant rather than a developer, the report serves the same function: an independent, dated, photographed record of the condition of the property.

Re-inspection and de-snagging

Getting the list fixed is not the same as getting it fixed properly.

A re-inspection is a second visit after the remedial work has been done, checking each item on the original list, marking it as resolved or not, and noting anything the remedial work itself has damaged, which happens more often than you would like. Rectification work in an occupied or nearly occupied property routinely causes new marks, and a closing check catches them while somebody else is still responsible.

You get an updated report showing what has been closed and what remains open, which is the document that tends to end the argument.

Villas, apartments and towers

Apartments and townhouses are the bulk of handover snagging. Access is straightforward, but the inspection needs the services energised: power on, water on, and the air conditioning running, or several systems cannot be tested. A unit handed over with the power still on the builder's temporary supply, or the water not yet connected, limits what can be checked, and that is worth resolving before the appointment.

Read more Read less

Villas are larger and take longer, and add roof areas, external walls, boundary and gate items, garden drainage, irrigation, pumps, an underground water tank (which is a job for underground tank cleaning before you move in), and often more air-conditioning units and a larger electrical installation.

Towers add practical constraints: building management access, contractor registration and permits, service-lift booking for any remedial work that follows, and set working hours.

Contractor registration, insurance documentation and permits are handled by us as part of any remedial work. PROTECH Dynamics is fully insured. Because the remedial list usually spans trades, running one contractor across the trades is often the cleanest way to close it.

Dilapidation reports, pre-purchase checks and end-of-period checks

Snagging is associated with new handovers, but the same inspection has three other uses.

Read more Read less

Before buying on the resale market, a condition inspection tells you what you are actually acquiring: the state of the air conditioning, the electrical installation, evidence of past or present leaks, and the finishes. It is a smaller cost than the surprises it finds.

Before the end of the period your developer's documents describe, a check gives you the chance to raise anything that has emerged since handover while it can still be raised. Faults that appear in the first year (settlement cracks, sealant failures, air-conditioning problems that only show under summer load) are exactly the ones that were not visible on handover day.

At the start or end of a tenancy, a documented condition report protects both sides and takes the argument out of the deposit. This is the document usually called a dilapidation report: a dated, photographed record of the state of the property when one party hands it to the other, produced the same way and to the same standard as a handover snagging report.

Remedial work after the inspection

We do the trades. Painting, tiling, joinery, doors, electrical, plumbing, air conditioning and general finishing are all in-house, which means that when the developer will not fix something, or you would rather not wait, the work can be done by the people who wrote the list.

Read more Read less

That creates an obvious conflict of interest, and the honest way to handle it is to be direct about it. The report is the same whether or not you use us for the remedial work. Nothing gets added to a list to create work, and nothing gets left off because it is inconvenient. The report is yours to take to the developer, to another contractor, or to nobody at all. Whether the inspection can be booked on its own, and how the fee is treated if you do go on to book remedial work, is confirmed when you enquire. If we cannot write a straight report we do not have a business worth having.

Warranty. The inspection itself is a report rather than warrantable work: what you are buying is a dated, documented record of condition, and it stands on the evidence in it. Where we carry out the remedial work, warranty terms for your job are confirmed in the written quotation. Parts and equipment carry the manufacturer's own warranty, which we pass through with the paperwork.

Once the list is closed and you have moved in, the routine upkeep that stops the same faults coming back runs under our maintenance packages rather than under an inspection.

How to prepare for the inspection

A few things make the visit much more productive.

Make sure the power and water are on and the air conditioning is running, since several checks depend on it. Arrange access, including the keys, any access cards, and parking, and let building management know if a permit or registration is needed for us to enter. Have your handover pack or unit drawings available if you have them, along with any specification of what you were promised, because "the wrong tap was fitted" is only a snag if we know what was supposed to be there.

Ideally, do the inspection before your furniture arrives. Once a property is furnished, a meaningful proportion of the floors, walls and joinery cannot be seen at all.

Tell us in advance about anything you have already noticed, but do not spend hours making your own list. Finding them is our job.

What decides the price

We do not publish a single figure for an inspection, because a studio and a five-bedroom villa are not the same day's work. What moves it:

Read more Read less
  • The size of the unit and the number of rooms, since every room is checked rather than sampled.
  • Whether it is an apartment, a townhouse or a villa, because a villa adds roof areas, external walls, boundary and gate items, garden drainage, irrigation, pumps and an underground water tank.
  • Whether the property is empty or furnished and occupied, which changes both what can be reached and how long the visit takes.
  • Whether you want a re-inspection after the remedial work, booked at the same time or later.
  • Whether you want us to attend site with the developer's team to walk the list with them, which is a separate visit.
  • Whether the report has to be produced in a particular format that a developer, a managing agent or a landlord has specified.

Remedial work is quoted separately from the inspection, after you have the report, so the two are never bundled into one number. You get a written quote before any work begins. To book the inspection window, tell us the handover date and the property size and we will confirm the visit.

Snagging Inspection Price Guide

Transparent pricing with no hidden fees. Final price confirmed after assessment.

Studio or 1-bed apartment

From AED 880

Full room-by-room check

2-bed apartment

From AED 1,450

Full room-by-room check

3-bed+ apartment

From AED 1,850

Full room-by-room check

Townhouse

From AED 2,450

Full property inspection

Villa, up to 5,000 sqft

From AED 2,950

Full property inspection

Villa, over 5,000 sqft

From AED 0.55 / sqft

Priced per sqft above 5,000

Photographed defect report

Included

Issued with every inspection

Re-inspection after developer remedial

From AED 650

Per revisit

Thermal imaging add-on

From AED 480

Optional add-on

Prices are indicative. We provide a written quote before starting any work. No call-out fees for standard services.

Frequently Asked Questions

When should we book the inspection?

Before you accept handover if at all possible, and while the unit is empty. If you have already taken handover, book as soon as you can, because time works against you and furniture hides defects.

Do we need to be there?

How long does it take?

Will the developer accept your report?

Is a snagging report a structural survey or a valuation?

Can you inspect a property that is already furnished and occupied?

Can you fix the defects as well?

Do you check the air conditioning and the electrics, or only the finishes?

Related Services

Explore more services from PROTECH Dynamics

Service Areas in Dubai

PROTECH Dynamics serves all communities across Dubai

Emergency response available to any location across Dubai.

Need Emergency Service?

Our emergency team responds 24/7 across all of Dubai.

Book a snagging inspection

Book the inspection window with the handover date and the property size, and we will confirm the visit and give you a written report.